SUNRISE 11.544 MWdc 

TIMELINE : Develoed from greenfield to COD

2014 : Acquired the land and FIT and original development permit from a 3rd party. Development team redesigned the plant layout and amended the development permits.  

2015 : EPC & Financing contracts negotiated, project achieves NTP

2016 : Project reaches COD and begins selling power under the FIT

2017 : Project Sold to Itochu-Enex

Plant details:

  • Photovoltaic module: Trina Solar PC05A – 260W
  • Converter: ABB PVS800-57-630 kW
  • AC/DC power capacity: 9.5 MWac / 11.544 MWdc
  • Number of modules: 44,400 Units 
  • Number of stations:  7 x (2 x 630 kW) stations
    1 x (1 x 630 kW) station 
  • Feed in Tariff: 40 JPY/kWh
  • EPC Contractor: Maetel – ACS Group