Our Projects Old

    Japan Project I

    SUNRISE 11.544 MWdc 

    TIMELINE : Develoed from greenfield to COD

    2014 : Acquired the land and FIT and original development permit from a 3rd party. Development team redesigned the plant layout and amended the development permits.  

    2015 : EPC & Financing contracts negotiated, project achieves NTP

    2016 : Project reaches COD and begins selling power under the FIT

    2017 : Project Sold to Itochu-Enex

    Plant details:

    • Photovoltaic module: Trina Solar PC05A - 260W
    • Converter: ABB PVS800-57-630 kW
    • AC/DC power capacity: 9.5 MWac / 11.544 MWdc
    • Number of modules: 44,400 Units 
    • Number of stations:  7 x (2 x 630 kW) stations
      1 x (1 x 630 kW) station 
    • Feed in Tariff: 40 JPY/kWh
    • EPC Contractor: Maetel – ACS Group